Pipe material, medium, duration, gauge range, pressure readings, photos, notes, time, location, and technician details stay together.

For plumbing contractors
PlumbGauge IQ
Document plumbing pressure tests without chasing photos and notes
PlumbGauge IQ captures pressure readings, pipe material, test medium, duration, gauge range, photos, inspector notes, GPS, timestamps, and technician details in one clean report.
Domestic water, DWV, rough-in, permit, and inspection pressure-test evidence is structured for customer, builder, and inspector review.
Field teams capture the evidence on site while office teams get a consistent report for review, storage, and delivery.
Plumbing pressure testing
Built around the way this pressure-test work is actually reviewed.
Use it for domestic water, DWV, rough-in, permit, inspection, and service pressure tests where builders, customers, inspectors, and office teams need clear evidence of what was tested and when.
Guide the crew while the evidence still exists.
Prompt technicians for the readings, photos, identifiers, location, timestamp, notes, and sign-off details that usually get reconstructed later from camera rolls, texts, paper forms, and memory.
Give operations a packet they can inspect before sending.
Keep test context, reviewer notes, exceptions, and report modules in one workflow so missing fields are visible before the record reaches a customer, builder, inspector, facility team, or internal QA file.
Show the work without overstating approval.
Reports are written as decision-support evidence: structured, timestamped, calibration-aware documentation that supports review without claiming certification, legal determination, or regulatory sign-off.
Capture domestic water, DWV, rough-in, permit, inspection, and service pressure-test records with the job context reviewers expect.
Track pipe material, test medium, duration, gauge range, readings, photos, inspector notes, GPS, time, and technician identity together.
Generate a customer, builder, or inspector report that is organized for review without claiming permit approval or compliance status.
Industry needs
Replace scattered field evidence with a review-ready record.
Missing rough-in evidence
Gauge photos and job notes can get buried in camera rolls before the builder, customer, or inspector asks for them.
Incomplete test details
Pipe material, medium, duration, gauge range, and system area are easy to miss when crews are documenting tests on paper.
Slow report handoff
Office teams lose time rebuilding the story of a test when readings, photos, notes, technician details, and timestamps are scattered.
Workflows
Sector workflows, terminology, and test context in one place.
Rough-in pressure tests
Document water or DWV rough-in tests with pipe material, test medium, hold duration, gauge range, photos, and crew notes before walls close.
Permit and inspection visits
Record the readings, photos, inspector notes, site contact, timestamp, and location details needed for a clear inspection file.
Service and remodel work
Capture line-specific pressure evidence for repairs, additions, remodels, and callbacks so office teams can see what changed on site.
Evidence requirements
Capture the details people ask for after the job is complete.
Test setup details
Store domestic water or DWV test type, pipe material, test medium, target duration, gauge range, and system area with each record.
Field evidence
Attach gauge photos, rough-in photos, inspector notes, GPS location, timestamp, technician identity, and observed conditions.
Review-ready report
Package readings, photos, setup details, notes, and sign-off fields into a report for customers, builders, inspectors, and internal files.
Field flow
From job setup to report handoff.
Select the job, test purpose, system area, and domestic water or DWV test type.
Enter pipe material, test medium, planned duration, gauge range, and pressure target.
Capture the gauge reading or enter a reviewed manual reading with supporting photos.
Add rough-in photos, GPS, timestamp, technician details, inspector notes, and site observations.
Send a customer, builder, or inspector report after internal review.
Reports and systems
Deliver the evidence package without rebuilding it by hand.
What reviewers see
One packet with the field story, proof trail, and handoff context.
Each industry page now mirrors the actual buying pain: reviewers do not just need a reading, they need to know which asset or line was tested, who captured it, what evidence supports it, and what still needs professional review.
Report modules
Integration points
PlumbGauge IQ helps plumbing contractors organize pressure-test evidence and handoff documentation. It does not approve permits, certify legal compliance, determine pass or fail status, or replace inspector, engineer, authority, or project-specific requirements.
Book demo
Make plumbing pressure-test reports easier to trust
Give crews a faster way to capture rough-in and inspection evidence, and give customers, builders, inspectors, and office teams a clear report tied to the work performed.