Water main pressure-test evidence with calibrated pressure logger, service lateral photos, GPS location, and asset ID
Industries

For utility contractors and municipal delivery teams

MainGauge IQ

Document water main pressure tests with asset-ready evidence

MainGauge IQ captures calibrated pressure logger data, test photos, asset IDs, map location, GPS, timestamps, technician details, and municipal form inputs in one clean field record.

Asset contextLocation-tied
Commissioning fileOne package
Handoff speedField to office
Asset contextLocation-tied

Asset IDs, map references, GPS, photos, timestamps, technician details, and pressure readings stay connected to the same utility test.

Commissioning fileOne package

Water main, service lateral, hydrant, valve, repair, extension, and commissioning evidence is structured for project and municipal review.

Handoff speedField to office

Crews capture logger data and location evidence on site while office teams receive a consistent report for form completion and delivery.

Water and civil utilities pressure testing

Built around the way this pressure-test work is actually reviewed.

Use it for water main, service lateral, hydrant, valve, repair, extension, and commissioning tests where contractors, engineers, inspectors, and municipal teams need a clear record of what was tested, where, and by whom.

Field capture

Guide the crew while the evidence still exists.

Prompt technicians for the readings, photos, identifiers, location, timestamp, notes, and sign-off details that usually get reconstructed later from camera rolls, texts, paper forms, and memory.

Office review

Give operations a packet they can inspect before sending.

Keep test context, reviewer notes, exceptions, and report modules in one workflow so missing fields are visible before the record reaches a customer, builder, inspector, facility team, or internal QA file.

Liability-aware handoff

Show the work without overstating approval.

Reports are written as decision-support evidence: structured, timestamped, calibration-aware documentation that supports review without claiming certification, legal determination, or regulatory sign-off.

Capture water main, service lateral, hydrant, valve, repair, extension, and commissioning pressure-test records with the field context reviewers expect.

Tie calibrated pressure logger readings, photos, asset IDs, GPS, map references, timestamps, technician identity, and notes to the correct location.

Generate contractor handoff packages and municipal form-ready reports for review without claiming municipal acceptance or regulatory approval.

Industry needs

Replace scattered field evidence with a review-ready record.

Scattered commissioning evidence

Pressure logs, gauge photos, map screenshots, and field notes can separate before the contractor handoff package is assembled.

Missing asset context

Asset IDs, stationing, valve numbers, hydrant IDs, and service lateral locations are easy to lose when crews rely on paper notes.

Slow municipal forms

Office teams lose time rebuilding test details when readings, photos, GPS, technician details, and municipal form fields are incomplete.

Workflows

Sector workflows, terminology, and test context in one place.

Water main commissioning

Document new main or replacement-main tests with asset IDs, stationing, map location, pressure logger data, test duration, and required photos.

Service lateral testing

Capture lateral-specific readings, curb stop or meter location details, photos, GPS, timestamps, and technician notes before turnover.

Hydrant and valve records

Attach hydrant, valve, blow-off, and test setup photos to the related asset so office and municipal teams can review the same evidence trail.

Evidence requirements

Capture the details people ask for after the job is complete.

Asset and location details

Store asset IDs, stationing, street or parcel references, GPS, map location, main segment, lateral, hydrant, valve, or service area with each record.

Calibrated logger evidence

Capture pressure logger readings, gauge or logger photos, test duration, target pressure, observed conditions, timestamp, and technician identity.

Handoff-ready package

Package readings, photos, asset details, notes, and municipal form fields into a consistent report for contractor, engineer, and utility review.

Field flow

From job setup to report handoff.

01

Select the project, test purpose, main segment, service lateral, hydrant, valve, or asset ID.

02

Enter target pressure, test duration, logger details, pipe information, and municipal form fields.

03

Capture calibrated pressure logger readings or add reviewed manual readings with supporting photos.

04

Attach site, gauge, logger, valve, hydrant, lateral, trench, map, GPS, timestamp, and technician evidence.

05

Review the record and export a contractor handoff package for municipal or project files.

Reports and systems

Deliver the evidence package without rebuilding it by hand.

MainGauge IQWater utilities evidence packet
Needs review
Project, contractor, and municipal utility summaryWater main, service lateral, hydrant, valve, repair, extension, or commissioning test typeAsset IDs, stationing, map reference, GPS, and service areaPipe information, target pressure, duration, and test setupCalibrated pressure logger readings and timelineGauge, logger, asset, trench, hydrant, valve, lateral, and site photos

What reviewers see

One packet with the field story, proof trail, and handoff context.

Each industry page now mirrors the actual buying pain: reviewers do not just need a reading, they need to know which asset or line was tested, who captured it, what evidence supports it, and what still needs professional review.

Location-tiedAsset IDs, map references, GPS, photos, timestamps, technician details, and pressure readings stay connected to the same utility test.One packageWater main, service lateral, hydrant, valve, repair, extension, and commissioning evidence is structured for project and municipal review.Field to officeCrews capture logger data and location evidence on site while office teams receive a consistent report for form completion and delivery.

Report modules

Project, contractor, and municipal utility summaryWater main, service lateral, hydrant, valve, repair, extension, or commissioning test typeAsset IDs, stationing, map reference, GPS, and service areaPipe information, target pressure, duration, and test setupCalibrated pressure logger readings and timelineGauge, logger, asset, trench, hydrant, valve, lateral, and site photosTechnician, timestamp, location, notes, and observed conditionsMunicipal form fields and contractor handoff PDF

Integration points

Utility asset and work order recordsGIS, map, and location referencesMunicipal form and commissioning filesCloud photo storageEmail and PDF handoff delivery

MainGauge IQ helps utility contractors and municipal delivery teams organize pressure-test evidence, commissioning records, and handoff documentation. It does not grant municipal acceptance, certify regulatory compliance, determine legal pass or fail status, or replace engineer, inspector, owner, authority, or project-specific requirements.

More industries

Same evidence core, adapted by sector.

Book demo

Make water utility pressure-test handoffs easier to review

Give field crews a faster way to capture calibrated pressure logger evidence, asset context, photos, GPS, time, and technician details, and give office teams a cleaner package for municipal forms and project records.